The Community / IBG Building Library

Better housing.Lower costs.Less development risk.

An adaptable multifamily building platform for comfortable, durable, all-electric housing with lower construction and operating costs.

IBG Designs coordinated construction systems and lessons learned from previous projects are applied to The Community design. Delivering superior price and energy performance at a reduced cost.

What The Community delivers

Better buildingsWith cost and performance considered together.

01

Lower construction cost

Developed details, coordinated systems and construction-informed decisions reduce repeated work and avoidable complexity and cost.

02

Operating affordability

Lower energy demand, appropriately sized systems and durable choices help control energy, maintenance and replacement costs.

03

Resident value

Climate resilient design delivers comfort, usable space, filtered fresh air ventilation and protection from outdoor heat, cold and wildfire smoke.

04

Earlier cost control

Site fit, scope, cost assumptions and unresolved constraints are addressed earlier, while decisions can still be changed. Providing better and earlier cost certainty.

Climate performance is part of the value: demand, equipment, comfort and operating cost are considered as one connected design solution.

Evidence

Proven performance.

Completed projects demonstrate how construction experience, coordinated systems and measured performance carry forward.

01 / Construction cost

Orion

32% below its defined baseline

A 2021 ZEBx study compared building-only construction cost with a BTY Group baseline of four similar code-minimum projects.

02 / Building performance

OSO

0.18 ACH50 airtightness result

The completed-building result is recorded in the ZEBx case study for two all-electric mixed-use buildings in Golden.

Historical comparisons remain attached to their original dates, scopes and baselines. They are evidence of the approach, not a price or performance guarantee for another site.

The Community applications

One design, many options.

Community building with services at street level

Community services

A proposed site-specific application shaped around local services and housing.

Community building with an extended ground floor

Extended commercial options

The ground floor can extend beyond the residential form to accommodate multiple commercial, childcare or community uses.

Community building arranged around a landscaped courtyard

Courtyard housing

The Community is organized around shared outdoor space, wide communal walkways, and corner housing units that maximize views and exterior exposure.

Explore a configuration

Set your building options and try different mixes of homes.

Design your own community

Site adaptation

Start with a coordinated base building design—then adapt it to the site.

Established starting point

  • Base building design and details
  • Pre-coordinated assemblies and systems
  • Finish and product specifications
  • Consultant and supplier experience
  • Lessons learned from commissioning and operation

Reviewed and adapted

  • Site, access and orientation
  • Housing program and mix of homes
  • Height and structural requirements
  • Mechanical design and local climate
  • Code and authority requirements

Established home layouts

A mix of home design options becomes an adaptable floorplate.

Community home layout A
Unit A
Community home layout B
Unit B
Community home layout C
Unit C
Community home layout D
Unit D
Community home layout E
Unit E
Community home layout F
Unit F
Community home layout G
Unit G
Five-home floorplate combining Community home layouts

Five-home floorplate

Multiple home types combine around shared circulation and service space.

Three-home floorplate combining larger Community home layouts

Three-home floorplate

Larger homes can be introduced while retaining the same organizing logic.

Performance by design

You are not paying to rediscover the building.

01

Reduce demand

Use envelope, orientation and detailing lessons to reduce heating and cooling demand.

02

Design to fit

Size and coordinate mechanical systems around the project-specific demand.

03

Simplify delivery

Use construction-informed details to reduce avoidable complexity and installation conflict.

04

Carry lessons forward

Apply learning from building, commissioning, maintenance and operation.

Lower pre-development risk

Budget confidence begins with better questions.

Could we spend heavily before learning the project does not work?
Use a site fit and feasibility review to test assumptions, gaps and next decisions early at low cost.
Could the design become difficult or expensive to build?
Reduce design and coordination risk through costed and proven construction-informed details.
What will ownership cost over time?
Proven building designs have shown over time lower energy, operating and maintenance costs in climate resilient buildings.

Site-adaptable does not mean site-approved. Every project still requires assessment of site conditions, authority requirements, financing, engineering and final pricing.

A practical first step

Discuss your site or stalled project.

Start with project qualification: the site, housing program, current stage and principal constraint. Where The Community appears to fit, the next scope and authorization decision are defined before work proceeds.

  1. 1Project qualification
  2. 2Site fit and feasibility
  3. 3Scope and authorization
  4. 4Findings and recommended path
Discuss your site or stalled project